4–8% of Construction Cost is Lost to Design Information Errors
Valiblox is the AI QA manager that stops errors before issue for construction (IFC).
No sales pitch. Just a quick review of how Valiblox checks a real document package.
Large projects issue huge volumes of design information — teams cannot keep up with manual checks.
300–800
Drawings per Week
40–60
RFIs per Fast-Track Project
€5k–€50k
Typical Rework Event
Manual Checks Cannot Keep Up
Teams try to control this with manual checks and spreadsheets. They cannot keep up. Incorrect or outdated drawings slip through and reach site.
Errors become RFIs
€1k–€3k per occurrence.
Rework on site
€5k–€50k per event. Coordination delays cost days or weeks.
Claims escalate
Often six figures. Fast-track projects typically generate 40–60 RFIs, many caused by incorrect or outdated drawings.
What Gets Checked
Valiblox Automatically Validates Document Packages
Validation happens before documents reach site.
Drawing naming standards
Verify filenames match your naming convention across the entire package.
Title block and revision alignment
Confirm title block data and revisions are consistent and correct.
Package completeness
Identify missing files and documents before issue.
These checks confirm which revision is correct and which files are safe to issue.
One structured report per validation run.
Process
Manual checking vs automated verification.
Manual Approach
- Manual spreadsheet tracking
- Hours checking drawings
- Revision mistakes discovered on site
- Limited traceability
With Valiblox
- Automated package validation
- Verification in minutes
- Errors caught before issue
- Time-stamped validation history
Validate before issue. Keep errors off site.
Submission readiness, made visible.
What You Receive
Compliance score
Package-level compliance score showing submission readiness.
Missing or incorrect drawings
Identify drawings that are missing, outdated, or incorrectly named.
Revision mismatches
Flag revision conflicts across the package.
Title block inconsistencies
Detect mismatches in title block metadata.
Traceable validation history
Time-stamped record of every check — what was verified and when.
Evidence your team can trust
Construction teams trust evidence. The report shows exactly what was checked and when.
Traceable Validation History
Valiblox records a time-stamped history of every package check. This traceability protects teams during claims, disputes, and audits.
What the Validation Report Shows
The report includes compliance score, missing or incorrect drawings, revision mismatches, title block inconsistencies, and time-stamped validation history.
See Sample Report2-Minute Demo
See how Valiblox validates a package, reviews issues, and exports evidence in under two minutes.
Watch Full DemoHow It Works
01
Upload the package
Drawings, specifications, and models.
02
Automatic validation
Valiblox verifies naming, revisions, and metadata across the package.
03
Clear report
Teams see exactly what must be fixed before issuing the package.
Stop design information errors before they reach site.
Large projects cannot afford incorrect design information. Projects move faster. Teams issue information with confidence.
Most demos take less than 15 minutes and use real project examples.