Professional QA in design and documentation isn't just a "nice to have" — it's a direct profit driver. Case studies from data centre and large industrial builds consistently show that a small investment in QA prevents millions in rework, delay penalties, and lost revenue.
Case Study 1: Tier III Data Center – North America
A $110M, 40MW Tier III build integrated independent QA before issuing construction drawings. Review cost: $2.4M (2.2% of budget).
- QA caught 37 major coordination issues, including electrical/structural clashes
- Prevented estimated $7.8M rework and 45 days of schedule slip
- Net benefit: ~$5.4M. ROI: ~225%
Case Study 2: Hyperscale Facility – Europe
Hyperscale operator invested in third-party QA during Stage 3 design. QA cost: €3M (1.8% of budget).
- Detected missing redundancy in cooling loop that would have failed Tier IV review
- Avoided late redesign costing €9M and 3-month commissioning delay
- Net benefit: ~€6M. ROI: 200%
Case Study 3: Colocation Facility – APAC
Colocation build in APAC region, budget $85M. Added QA gate at 75% design review. QA cost: $1.6M.
- Identified 22 missing scope items and 15 incorrect equipment specs
- Avoided ~$5.2M in change orders and 30 days delay penalties
- ROI: ~225%
Summary
Across all three case studies, QA investment ranged from 1.8%–2.2% of project value and delivered ROI of 200%–225%. The consistent pattern: a small upfront investment prevents outsized downstream costs in rework, delays, and penalties.
Bottom Line
Professional QA delivers measurable ROI. The case studies show a consistent 200%–250% return on investment, along with schedule protection and reputational benefits. If you're not doing it, you're betting millions on luck — and the odds aren't in your favour.